Showing posts with label HO model railroad. Show all posts
Showing posts with label HO model railroad. Show all posts

Wednesday, November 14, 2018

Working on the electronics

Norm, Aiden and I were back working on the layout this week.  Norm finished up laying track and I helped Aiden drill holes for feeder wires.

drilling 1/8" hole for feeder wire

Aiden cut wire into 12" lengths for the feeder wires.  We made a mark on the bench where 12" was so that he could stretch the wire and then cut it.  


Measuring off 12" length of wire

cutting it to length


Once we had the wires cut Aiden pushed them through the holes.  He was just the right height to see the holes from the top and the bottom of the layout.

stringing wire from the top
and pushing them up from the bottom.  He also pulled them down from the top once in the hole.



Finally, a little playtime and getting a ground view of the layout!!  Aiden is a character!!








Wednesday, August 8, 2018

Readying the Layout for Track

In our most recent work session, we finished laying down the cork roadbed.  Then we sanded it to assure that it was level and free of bumps and any extruded silicone sealant.  We started sanding by hand with a 220 grit block, but found that to be hard going.  So we put a finishing sander to work with 180 grit paper installed.
Sanding the roadbed with the finishing sander was just the trick!
 Once the roadbed was sanded, it was ready for installing track.  We laid out the turnouts in their intended positions, then beginning at an arbitrary point on the layout, began to install track.
The layout with turnouts positioned at their intended locations
We drilled holes in each piece of track and all turnouts to allow nails to be driven through without splitting the rails.  Then we started the process of fitting the rail sections to the turnouts.  We were able to get track laid around about a third of the "outer loop."  We staggered the rails in each section by about four inches so there would be no kinks on the curves.

We've got a long way to go to get the rails fully installed.  We'll pick it up again when we're able to get together for another work session.

Thursday, August 2, 2018

More Roadbed!

As we explained in a previous post, we're using cork for the roadbed, gluing it to the plywood base with brown silicone sealant.  We had traced the planned rail locations using a pounce, or dressmaker's wheel, and then darkened the lines made by the pounce with a marking pen.  Following that, we inserted push pins at the mid-point of the lines, spacing them about every six inches or so.

The yard section of the layout, with push pins marking the centerpoint of the intended rail lines.
Then we laid out the cork against the push pins, cutting it to shape where needed to fit the turnouts.  We pinned the cork into final location to ensure that we had everything cut to fit the way we wanted it. 

A section of cork cut and pinned into location, ready for gluing.  This section will become the logging camp when the layout is finished.
Then, we lifted the cork sections and spread silicone sealant generously in the spot where the roadbed was to lie.  We pressed the roadbed back into position against the pins marking the center of the rail lines and, again using push pins, tacked the roadbed firmly down to the plywood base.

The main line and a passing track with the roadbed glued and pinned into position.
Because the silicone sealant is messy and because it was often easier to smooth it into place by hand, we wore gloves. 

The "hill" section of the layout, with all cork glued into position.  Note the test section of track pinned into position in the foreground.
Neatness didn't count here.  The fact that the silicone was spread around the plywood won't matter once we add scenery later.  We intentionally chose the brown sealant so any of it showing through the seams in the cork would not detract from the earthy appearance of the roadbed.

We laid one section of rail to test our planned method for joining sections on curves.  Since most of our layout is curves, this is especially important for us.  The method we'll be using is to stagger the joints in the rails by about six inches so no two rail ends appear side-by-side.  Although this is somewhat non-traditional, we feel it will make it much easier to avoid kinks in the rail at the point where joins occur.  Our test proved us right.  The fit of the rails when joined by our method was perfect and should lead to no derailments at those points.

The yard section with cork trimmed to fit and pinned into location, ready for gluing to the plywood base.
 In our latest session, we managed to get all the cork fit into final position and glued all of it except the yard portions.  We'll finish those in our next session and then start laying rail.  We're pleased with our progress and excited to see the bare bones of the benchwork taking the shape of an actual railroad layout.



Sunday, July 8, 2018

Finished up the coal tipple roof

Aiden and I finished weathering the coal tipple roof.  We used some light tan and white pastel chalks to age the tar paper and then used a rust wash to add rust to the metal chimney pipe.  We also used the rust wash to show some on the rust washing down to the front edge of the roof.

Aiden adding some chalk to the roof



the weathered roof


  After we had fun working on the structure I had to put Aiden to work cleaning my shop.  He actually loves pushing the broom around and using the vacuum!!

Vacuuming my lathe




getting all the wood shavings off the floor


Securing the Subroadbed

In our most recent work session, we fastened down the subroadbed--1/2 inch plywood cut out to shape--so it is secure.  We installed risers to do the job.  The riser were made of scrap 1X3 inch lumber with a 1X1 inch rail fastened to the top for added support.  The riser rails were attached to the risers with wood glue and nails.  The risers were then screwed to the 1X4 benchwork at the correct height and the subroadbed screwed into the risers.

The risers were fabricated from scrap 1X3" lumber with a horizontal rail attached for added support

The subroadbed was secured to the risers with drywall screws
We completed the job of attaching all the subroadbed to the benchwork.

Aiden and Jeff securing the subroadbed to the benchwork

The elevated section of the layout.  Aiden is helping Jeff drill holes for screws to hold the subroadbed securely in position

We then made some conforming cuts in the plywood base to accommodate a planned gorge and river bed.
Aiden is cutting off a a projection from the end of what will be the logging camp portion of the layout
Even after carefully planning the elevation of the subroadbed, we discovered some places where the superelevation lay in the wrong direction or was higher than wanted.  We loosened the screws holding the risers in place and adjusted them to level them properly.

A check of the level showed the logging camp area to be out of level; we adjusted the lean of the riser to correct it
We are satisfied that we now have the benchwork in place, ready for laying track.  In our next session, we'll be laying cork roadbed and preparing to install track.  So we're getting closer to running trains!  It's getting exciting!

Norm

Converting a Brass Locomotive to DCC

I have a love of steam locomotives and it's perhaps natural that his interest should gravitate to brass engines.  I like the details and weight of brass locomotives and also look forward to the challenge of restoring them to excellent running condition and converting them to DCC and sound.  Inspired by an article in Railroad Model Hobbyist on installing replacement motors and gearing, I decided that making such conversions is probably within my ability, even though I've never done one before.

I located a suitable subject for conversion on eBay: a Pacific Fast Mail Tenshodo USRA 0-8-0 that he would like to see operating in the yard of the North Fork & Crooked Run Railway.  This engine was unpainted and the electrical connections to the motor were severed.  The coal load, which had been added to the original model, was partially missing.
The PFM Tenshodo USRA 0-8-0 in its original condition
The first task was to build a cradle to hold the locomotive, and others to follow, upside down for disassembly and repair.  I had some surplus walnut left over from another project and, using pocket hole screws, made a U-shaped device 15 inches long.  To the sides of the U, I stapled a piece of cloth draped into the well of the U so it would hold a locomotive at a height convenient for working that would safely protect the locomotive's details.

Then I tested the conductivity of the locomotive with an ohmmeter.  The drivers proved to be insulated, an essential criterion.  Had they not been insulated, the whole project would have had to be scrapped, as replacing the drivers would have been out of the question.  I got good conductivity from the drawbar to the motor wire, on the other hand.  However, this was not really important, as the motor is slated for replacement.

The next step was to remove the boiler and tender shell.  The boiler is held in place by a large screw through the steam chests and two small screws located at the back of the cab.  Four screws hold the tender shell to its frame.  I removed the tender wheels at the same time.  I had purchased a plastic box with dividers to hold the parts from the locomotive, and as I removed these, I placed them in individual compartments with a label to remind me what they are.

The disassembled USRA 0-8-0


I then evaluated the motor's ability to power the disassembled drive train.  It operated only haltingly and then only when I put hand pressure on it.  Clearly, it was a candidate for replacement.  The original motor was an open frame type.  Experts in this field call for replacing these originals with can motors.

The original open frame Tenshodo motor failed to function and clearly needed replacing
The gearbox was also found to have a lot of slop in it and I decided it too needed replacing, as did the coupling mechanism.  These imported brass locomotives used a piece of rubber tubing to join the motor to the gearbox.  The tubing had enough flexibility to accommodate movement in the gears during starting and stopping movements.  But over time, they stiffen up and can even crack, thus losing their ability to transmit power to the wheels.  The recommended practice is to replace this linkage with a dogbone style coupling.

The original gearbox had a lot of play in it and it and the coupling mechanism were clear candidates for replacement
I then measured the interior size of the boiler and tender to determine the sizes of parts that could be fit into them and ordered parts for upgrading and restoring the locomotive.  Based on the measurements and my own intentions for the restored model, I ordered the following parts:

From Osorail, the following North West Short Line parts:

  • A 36:1 idler gearbox with ball bearings; this will make the switcher run a little more slowly than the 28:1 gearbox, and the ball bearings will help it run more smoothly
  • A 16mm flywheel
  • The 2032D-9 flat can motor
  • Axle stock and shaft universal connectors
I also ordered some tools to help ensure accurate and precise installation of parts:
  • The Sensipress to press together wheels and gears
  • The Quarterer, to assure that the drive wheels are properly quartered
  • The Aligner for 3mm axles to enable precise wheel and fear alignment
I probably would not have purchased these tools for a single locomotive, but I have in mind converting others in the future and it made sense to have them available for the first conversion to help it go smoothly and accurately.

From Yankee Dabbler, via eBay:
  • The Soundtraxx Tsunami2 TSU-2200 2 amp sound card for steam engines which contains a large variety of steam locomotive and whistle sounds, among other effects, and which incorporates DCC capability so a separate DCC card is not required
  • The Soundtraxx Current Keeper, which contains a capacitor to keep power to the locomotive even when it's passing over dirty track with poor conductivity
From Tony's Trains:
  • A TDS high bass 28mm speaker
  • A TDS speaker enclosure
While waiting for these parts to arrive--and the time to install them--I cleaned and painted the locomotive and tender.  I'll address that in a future posting.

Norm

Friday, June 15, 2018

Making the Elevated Track Sections

Our latest work session, which was a long day of working, was to lay out the track locations on the plywood base and then cut the plywood in the "hill" section of the layout so we can elevate the track.

Here we are, ready for a work session in Jeff's shop; that's Norm on the left, Jeff on the right





































We began by positioning the full scale pages on the plywood base until we got them into final position.

OK, so we had a little help getting the patterns into position on the plywood base
 The next task was to transfer the pattern to the plywood underneath.  To do this, we used a dressmaker's pattern tool called a pounce.  A pounce is a wheeled device with sharp spokes that poke through the pattern to the material underneath, in this case the plywood.

A dressmaker's pounce, also sometimes used to simulate rivets and nail holes in scale models
The recommended practice was to trace the pounce marks with a Sharpie, which was supposed to bleed through the holes left by the pounce and leave a trail on the plywood.  This, we found, was only partially successful, and we ended up re-tracing the pounce marks with marking pens so we would have lines we could follow when cutting out the plywood.

Here Norm is tracing the pounce wheel marks with a Sharpie; while some of the ink flowed through the holes, it did not leave the expected clear line for the saw to follow
We retraced the pounce marks, often better visible by the dents left in the plywood, so we would have clear lines to follow when we cut out the patterns with the jig saw
Next, we propped the plywood on 2X4s so we could cut out the patterns with a jig saw.

Jeff is cutting along the cut lines that mark the edge of the roadbed sections; in all cases we also marked the planned centerline for the track itself so that remains visible on the roadbed
Once we had the plywood cut, we clamped it into position at varying heights to plan the elevations we want to have for the final layout.  This is a critical phase, since it affects the rate of elevation and the difficulty trains will have climbing the ascents.  So, we only temporarily clamped the plywood into place to give ourselves plenty of time to think about things before we finalize them.

The layout with the plywood cut to shape for the roadbed and clamped into rough position to simulate elevations.  The plywood bent smoothly without kinks and it looks like this method will be successful in making a smooth-operating layout



Sunday, June 10, 2018

The Grandkids do some work and run some trains!

Just a quick update.....the grandkids, Anthony and Aiden were visiting today and got to help out on the benchwork.  Aiden (age 7) drilled the pilot holes while Anthony (age 10) put the screws in.  They really enjoyed getting on top of the bench and helping out!

My wife Ellen had a surprise for them.  She bought each of them an engineer's cap and red neckerchief!!  They even had their names on them..."Aiden" and "Tito" (Anthony in Spanish)  Of course, they had to wear the neckerchiefs around their faces like bandits!

After doing some work I put out a few straight pieces of track and let them have some fun running a couple of trains!!

Here are a few pictures that captured the fun we had today!!

Getting ready to work

Aiden would drill the pilot holes and Anthony would put the screw in

Aiden looking cute!

You can probably tell who is the clown in the family!!

Anthony went to town and had a good time

He loves to work in the shop

We even got underneath and drilled a few holes for future wires

running some trains

Aiden's turn

They are ready to run trains!!









Using Templates to Plan the Track Locations

The AnyRail program we used to plan the location for the Atlas FlexTrack we'll be using lets you print out full size patterns for the track and turnouts from the plan you've developed.  Jeff, who designed the layout using AnyRail, printed out 97 pages of full size layout patterns!  Our next task, which we undertook yesterday, was to piece together all those sheets and tape them so they would remain in place.  It was a job that took several hours to accomplish.  But, we can now see in realistic size just where the track will be placed and whether we want to make any adjustments to track location before we start laying roadbed and track.

Jeff is piecing together the pages for the yard
The yard completed, it's on to the loops serving the "town" area of the layout
A portion of the "town" area, showing the passing track that will allow mainline trains to bypass local freight trains
A view of the whole layout, with the yard in the foreground
What will be a mountainous area, with logging camp, elevated outer loop and a tunnel (indicated by the solid blocks); the log pond and sawmill are at the right rear
The completed "town" area, with the mountainous area in the background
For now, the patterns are laid out in their approximate final locations.  We still need to screw down the plywood so it's fully secure--we only tacked it in a few places so it wouldn't more around while we were testing the track locations.  Once that's finished, we'll position the patterns in their final locations.  Then we'll use a pounce--like seamstresses use to make patterns on cloth--to trace the centerline of the track.  And we'll use an awl to mark the location of the turnout throws so we can drill the holes for the Tortoise machines with accuracy.  That will then let us lay down the cork roadbed and prepare to lay track.

Sure, we could have done all this by the seat of our pants, drawing the lines for the track directly on the plywood base.  But by using AnyRail, we took our planning through several iterations until we had all the features we wanted and fit everything into the space we've got.  The printouts are merely the culmination of that process and they are carrying us a very long way toward our ultimate goal--getting track down so we can run some trains!