Showing posts with label installing track. Show all posts
Showing posts with label installing track. Show all posts

Sunday, August 12, 2018

Aiden wires the layout

Just a quick post to say that we've started to wire the layout and Aiden was a big help.  Norm was working on track bed and laying cork so Aiden helped me install some bus wires.

We first measured how much of each bus-wire was needed and cut it too length.  We are using 14 gauge wire for the bus wires.  Norm pitched in and held one end and Aiden used a drill to twist the wires together.  A lot easier than twisting the pairs of wires by hand!!

Aiden used a drill to quickly and easily twist wires together


Once we had a bus pair of wires twisted together, Aiden crawled under the layout (he could almost stand!) and put the wires in the plastic clips that we had screwed to the bottom of the layout.







Aiden could almost stand under the layout!


He was a big help because I would have to have crawled under the layout on my hands and knees!




Putting the wires into plastic clips

We have started to lay track so future posts will focus on the track work and installing feeder wires onto the track sections and connecting them to these bus wires.

Wednesday, August 8, 2018

Readying the Layout for Track

In our most recent work session, we finished laying down the cork roadbed.  Then we sanded it to assure that it was level and free of bumps and any extruded silicone sealant.  We started sanding by hand with a 220 grit block, but found that to be hard going.  So we put a finishing sander to work with 180 grit paper installed.
Sanding the roadbed with the finishing sander was just the trick!
 Once the roadbed was sanded, it was ready for installing track.  We laid out the turnouts in their intended positions, then beginning at an arbitrary point on the layout, began to install track.
The layout with turnouts positioned at their intended locations
We drilled holes in each piece of track and all turnouts to allow nails to be driven through without splitting the rails.  Then we started the process of fitting the rail sections to the turnouts.  We were able to get track laid around about a third of the "outer loop."  We staggered the rails in each section by about four inches so there would be no kinks on the curves.

We've got a long way to go to get the rails fully installed.  We'll pick it up again when we're able to get together for another work session.