Sunday, August 12, 2018

Aiden wires the layout

Just a quick post to say that we've started to wire the layout and Aiden was a big help.  Norm was working on track bed and laying cork so Aiden helped me install some bus wires.

We first measured how much of each bus-wire was needed and cut it too length.  We are using 14 gauge wire for the bus wires.  Norm pitched in and held one end and Aiden used a drill to twist the wires together.  A lot easier than twisting the pairs of wires by hand!!

Aiden used a drill to quickly and easily twist wires together


Once we had a bus pair of wires twisted together, Aiden crawled under the layout (he could almost stand!) and put the wires in the plastic clips that we had screwed to the bottom of the layout.







Aiden could almost stand under the layout!


He was a big help because I would have to have crawled under the layout on my hands and knees!




Putting the wires into plastic clips

We have started to lay track so future posts will focus on the track work and installing feeder wires onto the track sections and connecting them to these bus wires.

Wednesday, August 8, 2018

Readying the Layout for Track

In our most recent work session, we finished laying down the cork roadbed.  Then we sanded it to assure that it was level and free of bumps and any extruded silicone sealant.  We started sanding by hand with a 220 grit block, but found that to be hard going.  So we put a finishing sander to work with 180 grit paper installed.
Sanding the roadbed with the finishing sander was just the trick!
 Once the roadbed was sanded, it was ready for installing track.  We laid out the turnouts in their intended positions, then beginning at an arbitrary point on the layout, began to install track.
The layout with turnouts positioned at their intended locations
We drilled holes in each piece of track and all turnouts to allow nails to be driven through without splitting the rails.  Then we started the process of fitting the rail sections to the turnouts.  We were able to get track laid around about a third of the "outer loop."  We staggered the rails in each section by about four inches so there would be no kinks on the curves.

We've got a long way to go to get the rails fully installed.  We'll pick it up again when we're able to get together for another work session.

Thursday, August 2, 2018

More Roadbed!

As we explained in a previous post, we're using cork for the roadbed, gluing it to the plywood base with brown silicone sealant.  We had traced the planned rail locations using a pounce, or dressmaker's wheel, and then darkened the lines made by the pounce with a marking pen.  Following that, we inserted push pins at the mid-point of the lines, spacing them about every six inches or so.

The yard section of the layout, with push pins marking the centerpoint of the intended rail lines.
Then we laid out the cork against the push pins, cutting it to shape where needed to fit the turnouts.  We pinned the cork into final location to ensure that we had everything cut to fit the way we wanted it. 

A section of cork cut and pinned into location, ready for gluing.  This section will become the logging camp when the layout is finished.
Then, we lifted the cork sections and spread silicone sealant generously in the spot where the roadbed was to lie.  We pressed the roadbed back into position against the pins marking the center of the rail lines and, again using push pins, tacked the roadbed firmly down to the plywood base.

The main line and a passing track with the roadbed glued and pinned into position.
Because the silicone sealant is messy and because it was often easier to smooth it into place by hand, we wore gloves. 

The "hill" section of the layout, with all cork glued into position.  Note the test section of track pinned into position in the foreground.
Neatness didn't count here.  The fact that the silicone was spread around the plywood won't matter once we add scenery later.  We intentionally chose the brown sealant so any of it showing through the seams in the cork would not detract from the earthy appearance of the roadbed.

We laid one section of rail to test our planned method for joining sections on curves.  Since most of our layout is curves, this is especially important for us.  The method we'll be using is to stagger the joints in the rails by about six inches so no two rail ends appear side-by-side.  Although this is somewhat non-traditional, we feel it will make it much easier to avoid kinks in the rail at the point where joins occur.  Our test proved us right.  The fit of the rails when joined by our method was perfect and should lead to no derailments at those points.

The yard section with cork trimmed to fit and pinned into location, ready for gluing to the plywood base.
 In our latest session, we managed to get all the cork fit into final position and glued all of it except the yard portions.  We'll finish those in our next session and then start laying rail.  We're pleased with our progress and excited to see the bare bones of the benchwork taking the shape of an actual railroad layout.