Showing posts with label North Fork & Crooked Run Railway. Show all posts
Showing posts with label North Fork & Crooked Run Railway. Show all posts

Wednesday, January 23, 2019

We've Started the Scenery

It's been a while since we posted anything, mainly due to the holidays.  But we've been working on the railroad and have continued to make progress.  First off, we've now gotten all of the Tortoise switch control boxes installed.  There are 19 in all, grouped into three zones.  We also have two of the zones--the logging area and the town area--temporarily wired, so we can throw the turnouts using the NCE controller.  The yard area is not yet wired and the seven turnouts there remain in waiting.

Next up for the turnouts is to build control panels.  Our plan is to insert printed plans of the layout behind thin acrylic sheets and mount the assembly on a hardboard sheet for stability.  We will then install push buttons to control the turnouts.  Red and green lights will indicate which way the turnout has been thrown.  We will have three panels in different locations convenient for operation in the logging, town and yard areas.

The biggest news is that we have now begun building scenery on the layout.  We began with the hillside where the logging camp, forest and farming area will reside.  Several structures will go into this area--the logging camp buildings and facilities, a barn and farm-related items--but a lot of the area will be open forest with lots of trees. 

Jeff's grandsons Anthony and Aiden participated in the scenery-building.  We first laid strips of cardboard we ripped to about 1 1/2" wide on the table saw, creating a lattice.  We attached these to the plywood track base with staples and hot glue.  A word of advice: don't get the hot glue on your fingers; it will cause 2nd degree burns.  Don't ask us how we know.
With the lattice work woven into place, Jeff is stapling the joints to give the structure greater stability.
Once the lattice work was in place, we dipped plaster cloth, the kind used to make casts, in water and draped them over the cardboard, smoothing them down to fully engage the plaster and leave as seamless a surface as we could.  The boys did all the messy work of laying down and smoothing the plaster strips and had a ball doing so.  After the first round of plaster cloth set up, we put on a second layer.  When fully set up, this created a hard shell on which we can continue adding scenery.
Anthony (left) and Aiden apply the plaster cloth and smooth it down to get a seamless result.  This is messy work.  The boys loved it!
Our next job is to paint the plaster with latex paint--PPG Tobacco Brown--and then coat the area with Lou Sassi's "ground goop."  Once that base has been applied, we'll fully detail the area with trees, grasses, and the like.
The finished project, with two layers of plaster cloth.  We'll smooth this out with Plaster of Paris, then paint it Tobacco Brown and apply "ground goop" before proceeding to detail the area.  This is where the logging camp and farming area will reside.

We reported earlier that we are now running trains.  We have the "outer loop" pretty much debugged and track problems corrected, but the "inner loop" has a number of issues yet to be addressed.  We're happy to report, though that we've tested the reversing loops and the electronics seem to be working as intended.  We've tested the track with several locomotives.  Most are still set for the default cab number of 003.  We will soon reprogram them to their locomotive numbers so we can run multiple trains at once, something we've not yet tried.

So, while we've made a lot of progress in building the North Fork & Crooked Run Railway, there are still a lot of opportunities and challenges left for us to take on.  Stay tuned for updates.

Wednesday, July 18, 2018

We're laying roadbed!!

A new phase of the NF & CR Ry. has begun....we are laying roadbed!!  The benchwork is complete and we have moved on to putting cork roadbed down.  It was exciting to actually start to see the roadbed start to take form.  We had experimented with running some trains up the grades and around the curves by just taping some track to the plywood but pretty soon we will start to lay track as well!




Norm putting adhesive caulk down onto the plywood.


We are using an adhesive caulk to glue the cork to the plywood base.  Norm spread the caulk with a putty knife following the centerlines that we had previously drawn.  Since the caulk would cover up the lines, we put push-pins along the centerline.  This also helped in placing the cork...we were able to just press the cork against the pins to follow the centerlines.



The caulk was easy to spread...but a little messy!



Once the cork was down, we used additional push-pins to keep the cork in place.  It was a little messy but it all went together well.  Next time....we will wear gloves!!


The cork went down onto the caulk and was pushed up to the pins.  Additional pins were used to held the cork in place.


Aiden even got into the fun and helped nail down a few push-pins.  He is having fun helping with the layout but I think he really would be happier running some trains!!



The supervisor even nailed some pins down!



Finally, some pictures of the roadbed at the end of the day.  We are doing the outer-loop first so that we can lay some track and run some trains.  It will be both exciting and amazing to watch that first train make a loop around the layout!!


Cork roadbed going around the outer loop


Close-up of the roadbed.

Sunday, July 8, 2018

Finished up the coal tipple roof

Aiden and I finished weathering the coal tipple roof.  We used some light tan and white pastel chalks to age the tar paper and then used a rust wash to add rust to the metal chimney pipe.  We also used the rust wash to show some on the rust washing down to the front edge of the roof.

Aiden adding some chalk to the roof



the weathered roof


  After we had fun working on the structure I had to put Aiden to work cleaning my shop.  He actually loves pushing the broom around and using the vacuum!!

Vacuuming my lathe




getting all the wood shavings off the floor


Securing the Subroadbed

In our most recent work session, we fastened down the subroadbed--1/2 inch plywood cut out to shape--so it is secure.  We installed risers to do the job.  The riser were made of scrap 1X3 inch lumber with a 1X1 inch rail fastened to the top for added support.  The riser rails were attached to the risers with wood glue and nails.  The risers were then screwed to the 1X4 benchwork at the correct height and the subroadbed screwed into the risers.

The risers were fabricated from scrap 1X3" lumber with a horizontal rail attached for added support

The subroadbed was secured to the risers with drywall screws
We completed the job of attaching all the subroadbed to the benchwork.

Aiden and Jeff securing the subroadbed to the benchwork

The elevated section of the layout.  Aiden is helping Jeff drill holes for screws to hold the subroadbed securely in position

We then made some conforming cuts in the plywood base to accommodate a planned gorge and river bed.
Aiden is cutting off a a projection from the end of what will be the logging camp portion of the layout
Even after carefully planning the elevation of the subroadbed, we discovered some places where the superelevation lay in the wrong direction or was higher than wanted.  We loosened the screws holding the risers in place and adjusted them to level them properly.

A check of the level showed the logging camp area to be out of level; we adjusted the lean of the riser to correct it
We are satisfied that we now have the benchwork in place, ready for laying track.  In our next session, we'll be laying cork roadbed and preparing to install track.  So we're getting closer to running trains!  It's getting exciting!

Norm

Converting a Brass Locomotive to DCC

I have a love of steam locomotives and it's perhaps natural that his interest should gravitate to brass engines.  I like the details and weight of brass locomotives and also look forward to the challenge of restoring them to excellent running condition and converting them to DCC and sound.  Inspired by an article in Railroad Model Hobbyist on installing replacement motors and gearing, I decided that making such conversions is probably within my ability, even though I've never done one before.

I located a suitable subject for conversion on eBay: a Pacific Fast Mail Tenshodo USRA 0-8-0 that he would like to see operating in the yard of the North Fork & Crooked Run Railway.  This engine was unpainted and the electrical connections to the motor were severed.  The coal load, which had been added to the original model, was partially missing.
The PFM Tenshodo USRA 0-8-0 in its original condition
The first task was to build a cradle to hold the locomotive, and others to follow, upside down for disassembly and repair.  I had some surplus walnut left over from another project and, using pocket hole screws, made a U-shaped device 15 inches long.  To the sides of the U, I stapled a piece of cloth draped into the well of the U so it would hold a locomotive at a height convenient for working that would safely protect the locomotive's details.

Then I tested the conductivity of the locomotive with an ohmmeter.  The drivers proved to be insulated, an essential criterion.  Had they not been insulated, the whole project would have had to be scrapped, as replacing the drivers would have been out of the question.  I got good conductivity from the drawbar to the motor wire, on the other hand.  However, this was not really important, as the motor is slated for replacement.

The next step was to remove the boiler and tender shell.  The boiler is held in place by a large screw through the steam chests and two small screws located at the back of the cab.  Four screws hold the tender shell to its frame.  I removed the tender wheels at the same time.  I had purchased a plastic box with dividers to hold the parts from the locomotive, and as I removed these, I placed them in individual compartments with a label to remind me what they are.

The disassembled USRA 0-8-0


I then evaluated the motor's ability to power the disassembled drive train.  It operated only haltingly and then only when I put hand pressure on it.  Clearly, it was a candidate for replacement.  The original motor was an open frame type.  Experts in this field call for replacing these originals with can motors.

The original open frame Tenshodo motor failed to function and clearly needed replacing
The gearbox was also found to have a lot of slop in it and I decided it too needed replacing, as did the coupling mechanism.  These imported brass locomotives used a piece of rubber tubing to join the motor to the gearbox.  The tubing had enough flexibility to accommodate movement in the gears during starting and stopping movements.  But over time, they stiffen up and can even crack, thus losing their ability to transmit power to the wheels.  The recommended practice is to replace this linkage with a dogbone style coupling.

The original gearbox had a lot of play in it and it and the coupling mechanism were clear candidates for replacement
I then measured the interior size of the boiler and tender to determine the sizes of parts that could be fit into them and ordered parts for upgrading and restoring the locomotive.  Based on the measurements and my own intentions for the restored model, I ordered the following parts:

From Osorail, the following North West Short Line parts:

  • A 36:1 idler gearbox with ball bearings; this will make the switcher run a little more slowly than the 28:1 gearbox, and the ball bearings will help it run more smoothly
  • A 16mm flywheel
  • The 2032D-9 flat can motor
  • Axle stock and shaft universal connectors
I also ordered some tools to help ensure accurate and precise installation of parts:
  • The Sensipress to press together wheels and gears
  • The Quarterer, to assure that the drive wheels are properly quartered
  • The Aligner for 3mm axles to enable precise wheel and fear alignment
I probably would not have purchased these tools for a single locomotive, but I have in mind converting others in the future and it made sense to have them available for the first conversion to help it go smoothly and accurately.

From Yankee Dabbler, via eBay:
  • The Soundtraxx Tsunami2 TSU-2200 2 amp sound card for steam engines which contains a large variety of steam locomotive and whistle sounds, among other effects, and which incorporates DCC capability so a separate DCC card is not required
  • The Soundtraxx Current Keeper, which contains a capacitor to keep power to the locomotive even when it's passing over dirty track with poor conductivity
From Tony's Trains:
  • A TDS high bass 28mm speaker
  • A TDS speaker enclosure
While waiting for these parts to arrive--and the time to install them--I cleaned and painted the locomotive and tender.  I'll address that in a future posting.

Norm

Friday, June 15, 2018

Making the Elevated Track Sections

Our latest work session, which was a long day of working, was to lay out the track locations on the plywood base and then cut the plywood in the "hill" section of the layout so we can elevate the track.

Here we are, ready for a work session in Jeff's shop; that's Norm on the left, Jeff on the right





































We began by positioning the full scale pages on the plywood base until we got them into final position.

OK, so we had a little help getting the patterns into position on the plywood base
 The next task was to transfer the pattern to the plywood underneath.  To do this, we used a dressmaker's pattern tool called a pounce.  A pounce is a wheeled device with sharp spokes that poke through the pattern to the material underneath, in this case the plywood.

A dressmaker's pounce, also sometimes used to simulate rivets and nail holes in scale models
The recommended practice was to trace the pounce marks with a Sharpie, which was supposed to bleed through the holes left by the pounce and leave a trail on the plywood.  This, we found, was only partially successful, and we ended up re-tracing the pounce marks with marking pens so we would have lines we could follow when cutting out the plywood.

Here Norm is tracing the pounce wheel marks with a Sharpie; while some of the ink flowed through the holes, it did not leave the expected clear line for the saw to follow
We retraced the pounce marks, often better visible by the dents left in the plywood, so we would have clear lines to follow when we cut out the patterns with the jig saw
Next, we propped the plywood on 2X4s so we could cut out the patterns with a jig saw.

Jeff is cutting along the cut lines that mark the edge of the roadbed sections; in all cases we also marked the planned centerline for the track itself so that remains visible on the roadbed
Once we had the plywood cut, we clamped it into position at varying heights to plan the elevations we want to have for the final layout.  This is a critical phase, since it affects the rate of elevation and the difficulty trains will have climbing the ascents.  So, we only temporarily clamped the plywood into place to give ourselves plenty of time to think about things before we finalize them.

The layout with the plywood cut to shape for the roadbed and clamped into rough position to simulate elevations.  The plywood bent smoothly without kinks and it looks like this method will be successful in making a smooth-operating layout



Sunday, June 10, 2018

The Grandkids do some work and run some trains!

Just a quick update.....the grandkids, Anthony and Aiden were visiting today and got to help out on the benchwork.  Aiden (age 7) drilled the pilot holes while Anthony (age 10) put the screws in.  They really enjoyed getting on top of the bench and helping out!

My wife Ellen had a surprise for them.  She bought each of them an engineer's cap and red neckerchief!!  They even had their names on them..."Aiden" and "Tito" (Anthony in Spanish)  Of course, they had to wear the neckerchiefs around their faces like bandits!

After doing some work I put out a few straight pieces of track and let them have some fun running a couple of trains!!

Here are a few pictures that captured the fun we had today!!

Getting ready to work

Aiden would drill the pilot holes and Anthony would put the screw in

Aiden looking cute!

You can probably tell who is the clown in the family!!

Anthony went to town and had a good time

He loves to work in the shop

We even got underneath and drilled a few holes for future wires

running some trains

Aiden's turn

They are ready to run trains!!









Using Templates to Plan the Track Locations

The AnyRail program we used to plan the location for the Atlas FlexTrack we'll be using lets you print out full size patterns for the track and turnouts from the plan you've developed.  Jeff, who designed the layout using AnyRail, printed out 97 pages of full size layout patterns!  Our next task, which we undertook yesterday, was to piece together all those sheets and tape them so they would remain in place.  It was a job that took several hours to accomplish.  But, we can now see in realistic size just where the track will be placed and whether we want to make any adjustments to track location before we start laying roadbed and track.

Jeff is piecing together the pages for the yard
The yard completed, it's on to the loops serving the "town" area of the layout
A portion of the "town" area, showing the passing track that will allow mainline trains to bypass local freight trains
A view of the whole layout, with the yard in the foreground
What will be a mountainous area, with logging camp, elevated outer loop and a tunnel (indicated by the solid blocks); the log pond and sawmill are at the right rear
The completed "town" area, with the mountainous area in the background
For now, the patterns are laid out in their approximate final locations.  We still need to screw down the plywood so it's fully secure--we only tacked it in a few places so it wouldn't more around while we were testing the track locations.  Once that's finished, we'll position the patterns in their final locations.  Then we'll use a pounce--like seamstresses use to make patterns on cloth--to trace the centerline of the track.  And we'll use an awl to mark the location of the turnout throws so we can drill the holes for the Tortoise machines with accuracy.  That will then let us lay down the cork roadbed and prepare to lay track.

Sure, we could have done all this by the seat of our pants, drawing the lines for the track directly on the plywood base.  But by using AnyRail, we took our planning through several iterations until we had all the features we wanted and fit everything into the space we've got.  The printouts are merely the culmination of that process and they are carrying us a very long way toward our ultimate goal--getting track down so we can run some trains!

Friday, June 8, 2018

AnyRail...a software tool to build a layout


At the end of my last entry I said I would discuss the modeling tool that I used to design our layout. I had an initial pencil sketch that was derived from looking at other layouts and then combined with the physical constraints of the space I had available in my workshop. However, I needed a way to formalize the drawing into something that could be implemented.

After looking at the various software programs available online I decided on a program called AnyRail. There were numerous tutorials on Youtube to help get started, it appeared to have a large library of track components from a variety of companies and it was free...well almost. There is a free version which lets you use up to 50 track pieces in a design. Surprisingly, this worked out quite well until we decided to add the switching yard which put me over the 50 piece limit. I could have split the layout into sections and kept them in different files but in the end I decided to purchase the program. You can do some interesting things with the program, like set track heights and compute slope percentages and it just seemed easier to do if I had the complete layout in one file. So....I paid the $60 for a license. It seemed a little steep but I think it was worth the cost.

Here is a screen capture of the AnyRail website.


AnyRail website


As you can see, you can produce a really nice layout that includes the track and structures/objects from libraries of manufacturers products. Now that we have our layout pretty well planned I'm going to start exploring some of the features to help plan our scenery. You can also look at layouts in 3D...here is another screen dump from their website.


3D view of a sample Layout from AnyRail


Here is the 'final' design of our layout.

Current design of our layout



There is a logging camp area, sawmill area, town area and switching yard area. We also have a small farming area if space permits. The left leg is about 8 feet long and the top leg is about 14 feet long.

AnyRail is very easy to use. As you can see in the image, you can define your layout bench shape and use that as a background. You can setup various settings to define things like layout size, grid spacing, alerts for minimum radius curves, snap to grid and snap to track endpoints, auto-connect, etc. You can see this in this image.
Setting Options along the top Ribbon

Then you can select track part libraries from various manufactures to use to build your layout. It is basically drag and drop. Once you've selected an object, like a piece of flex track, you can change it's shape using various menu selections. In the case of a flex track you can define it's length if straight, or curve length and radius if it is a curve or easement. You can move it, rotate it and move it next to another piece of track and have them connect together.

Menu Options for Piece of Atlas #500 Flex Track


One of the best features, and the most frustrating, is the alert when you create a curve that is less than the minimum curve radius you set in the settings. When creating a curve and trying to have it meet up with another piece of track coming from another direction you want them to meet up and connect together. It can become very frustrating to have them very close but when they auto-connect one piece has to change shape a little so that it connects squarely into the other track piece. In the image the track marked with a red line shows that the minimum radius of that part of the track has fallen below 18” which is my minimum radius setting. What's a little 6” radius curve among friends.


Red Highlight for Tight Curve




The feature we are playing with now is the capability to set a track section height and then the slope 
of adjoining track to go up to and back down from that height. For example, you can set a piece of track to be a bridge at four inches high and then compute a 3 percent slope in each direction. This will help us determine the heights we can achieve for the track heights in the logging area around the mountains we have planned. Here is an example.



Heights and Slopes


The final feature I'll mention is that you can create various sections within your layout. Our layout has four major sections....the outer track, the switching yard, the reverse loop in the logging area and the reverse loop in the town area. This will help in our DCC wiring planning.




Track Sections Highlighted in Different Colors

Now that our benchwork is pretty complete we need to transfer our track plan to the benchtop. We are going to use the cookie cutter approach to track layout. AnyRail can print a full size printout. When I did the print dialog box said 208 pages!! Luckily it went down to 97 when I clicked on the suppress blank page option!





One page of 97 to Print






Next step....tape all those pages together!