Monday, May 28, 2018

The Plan for the the NF & CR Ry. Layout

Our concept for the layout, as Jeff said, is to combine the ability for continuously running "through" freight trains with local switching action in the yard, in town, in a logging camp and a sawmill area.  To that end, and within the constraint of available space, we designed a layout plan that we feel will reach these general goals.  Adjustments will be needed as we actually lay track.  The town area will undoubtedly get some industry-serving sidings and the logging area may undergo some adjustments.  But this plan outlines the needed benchwork and will serve as the basic plan for the layout.

Norm

The plan for the NF & CR Ry.  Red dots indicating reversing loop points.  Grid squares are 3 inches.

No comments:

Post a Comment